Shikun & Binui Concessions Division

T

he Concessions Division combines the

Group’s financing, construction and

operating capabilities of large-scale

infrastructure projects with the extensive finan-

cial knowledge and aptitude, as well as a deep

familiarity with the public sector. This unique

combination renders Shikun & Binui a leading

entity pertaining to PPP projects. The division is

involved in most projects of this kind in Israel,

as well as in a variety of mega projects world-

wide. A large investment scale is required for

constructing a long-term project, usually for a

25-year franchise period.

The Concessions Division closely guides proj-

ects it is involved in, as of the publication of the

tender’s first stage through financing (closing

financing), along the years of construction and

operation through to the sale.

All of the Concessions Division’s projects are

planned, constructed, and managed according

to the Group’s vision. The Concessions Division

also has offices in Texas, USA, and in Bogota,

Colombia.

Selected projects currently under

construction

The East Perimeter Road in Cundinamarca, Co-

lumbia.

In 2014 Shikun & Binui won a tender

to construct a toll road, located in the Bogota

region. The estimated project construction cost

is approximately $550 million.

A toll highway on route SH288 in Texas, USA.

Shi-

kun & Binui won, and is implementing, (with part-

ners) a PPP project including planning, financing,

construction, operation and maintenance of a

highway toll road on route. $815 million.

Pumped Storage, Mount Gilboa, Israel.

A BOT

project for financing, planning, constructing and

operating a 300 MW power station, the first of

its kind in Israel, allowing energy storage and

release, using water reservoirs at different eleva-

tions. Estimated cost is NIS 2.2 billion.

Generi 2 Office Building in Jerusalem.

A PPP

project that includes planning, financing, con-

struction, operation, maintenance and delivery

of three 9-storey buildings, for 6 government

ministries.

Select completed projects

Israel Police Academy, Beit Shemesh.

A BOT

project including planning, financing, managing,

operating, maintenance and instruction services

for Israel Police for 25 years, construction cost is

NIS 600 million. The construction emphasized

sustainability aspects.

The New Tel Aviv Courthouse.

A modern Law

Courts tower building was inaugurated in 2014.

The building contains 52 courtrooms, 78 judges’

chambers, and a detention room. The building

was designed as a green building, highlighting

energy and water efficiency savings.

The Carmel Tunnels Project in Haifa.

The first of

its kind toll tunnels road in Israel. Constructed at

a NIS1.25 billion investment, in a BOT method,

for a period of 35 years. The project includes 4

tunnels at an overall length of 10 km, with the

largest interchange in Israel, containing 7 bridges

and ramps, as well as advanced technological

systems which enable command and control.

Environmental matters were stressed, including

noise and air quality monitoring.

Highway 6 (Cross Israel Highway).

This project is

the first of its kind for several reasons: the BOT

project of its kind in Israel, the first toll road in

Israel, and the longest highway nationwide. The

highway is currently 138 km long, with 12 inter-

changes, two tunnels and 100 bridges. During

the next several years it is expected to reach 247

kilometers. Its construction required professional

expertise, including overall planning, detailed

planning, paving, maintenance, financing and

operating a smart electronic toll-collection sys-

tem (of the most advanced worldwide), and man-

agement of a variety of environmental issues. In

2013 Shikun & Binui sold its shares in Highway

6. Shikun & Binui continues holding 35% of the

shares of the company operating the highway.

Road rehabilitation, upgrade and maintenance

(Northern Lanes).

The PFI project (Private Finance

Initiative) for the rehabilitation, operation, main-

tenance and financing the road network in the

north of Israel in an overall length of 270 km. for

a concession period of 20 years. Shikun & Binui

constructed cycle paths with Megiddo Regional

Council.

The Hadera Desalination Plant.

This plant sup-

plies one sixth of the household consumption of

water in Israel. Until recently, it was the largest

plant worldwide using reverse osmosis. Located

near Orot Rabin Power Station in Hadera. The

project was constructed with a NIS 1.5 billion

investment, as a BOT project won by ID2H Ltd.,

held by Shikun & Binui and by IDE Technologies

Ltd., for supplying 127 million cu.m. annually.

The group planned, financed, constructed and

currently operates the plant, and sells the water

to the government of Israel at a pre-defined price.

This arrangement will last 25 years (including

construction), at the end of which (in 2032) the

plant will be delivered to the Israeli government.

The unique finance transaction, with European

Investment Bank EIB and other European banks,

won Finance Deal of the Year for 2007 from the

exclusive financial magazine “Euromoney’s

Project”.

1A Hayarden St., P.O.B. 1133,

Airport City 7010000

Tel:

972-3-6300000 

Fax:

972-3-6301595

info@shikunbinui.com www.shikunbinui.com

Esta b l i s h e d

1995

l i n e o f b u s i n ess

Initiation, development, financing and implementation of Public Private

Partnership (PPP) projects in Israel and abroad in transport, desalination,

water, energy and social infrastructures

Yaron Karisi

CEO Shikun & Binui *

Ami Landau

CEO Shikun & Binui

Concessions Division *

Moshe Lahmani

Chairman of the Board

Shikun & Binui *

* See Top Executives Profiles - Page 582